About Styro-loc Past Jobs Endorsements Test Results Cad Details Specs ICC Report Contact Us

SECTION 07710
STYRO-loc® INTEGRAL SYSTEM FOR PARAPETS


PART I GENERAL

1.01 SECTION INCLUDES
   
     A. Labor, Materials, and equipment necessary to install the STYRO-loc® System

1.02 RELATED SECTIONS

     A. 03300 – Cast-in-Place Concrete
     B. 03470 – Tilt-up Precast Concrete
     C. 04200 – Masonry Units
     D. 05400 – Cold Formed Metal Framing
     E. 06100 – Rough Carpentry
     F. 06160 – Sheathing
     G. 07240 – Exterior Insulation and Finish System
     H. 07900 – Joint Sealers
     I. 09200 – Plaster and Gypsum Board

1.03 REFERNECES

     A. Negative Uniform Load Test
     B. Pull Out Capacity of Metal Insert
     C. Vertical Load Capacity

1.04 DEFINITIONS

     A. Architectural EPS Shape: Extruded Poly-Styrene cut into desired shape
     B. Metal Cap: A sheet metal item formed to fit over the parapet for protection from weather and
     other detrimental elements.
     C. Metal Straps: A sheet metal piece, minimum 2" x 16 gauge, attached to the STYRO-loc® system.
     D. Adhesive: A material used to attach an Architectural EPS Shape to the substrate
     E. Base Coat: The initial wet-state material used to embed a non metallic reinforcing mesh and encapsulate the
     Architectural EPS Shape
     F. Non Metallic Reinforcing Mesh: A non metallic woven mesh used to increase the rigidity of an Architectural EPS
     Shape
     G. STYRO-loc®: A specifically designed galvanized metal piece inserted in to the Architectural EPS Shape
     H. Substrate: The material to which the Architectural EPS Shape is attached
     I. Expansion Joint: A structural separation between building elements that allows independent movement without
     damage to the assembly.
     J. Wrap: The process by which the nonmetallic reinforcing mesh is utilized to protect any exposed edges of the
     insulation board by encapsulation in a base coat.

1.05 SYSTEM DISCRIPTION

     A. General: The STYRO-loc® system is designed to provide anchoring of a sheet metal cap, increase load
          resistance, induce rotational load transfer, and create architectural appeal in parapet construction
    
     B. Application Methods: The STYRO-loc® system is applied directly to a structure at the construction
         site or directly to a panel prior to attachment to structure I panelized construction
    
     C. Design Requirements and Limitations:
         
          1. Compatible substrates with the STYRO-loc® System
               a. Sound, unpainted concrete, Portland Cement Plaster, brick, or masonry
               b. Properly prepared, sound, painted surfaces
               c. Exterior Grade Gypsum sheathing conforming to ASTM C79-95
               d. Exterior grade glass mat gypsum sheathing
               e. Exterior or Exposure 1 rated plywood grade C/D or better minimum _"
               f. Cement backer board
               g. OSB board
         
          2. Expansion Joints: Placed at all Architect/Engineer placed expansion joints throughout the structure
         
          3. Terminations: Minimum _" at all terminations
         
          4. Sealant and backer rod
               a. Shall be supplied by a manufacturer approved by Foam Concepts, Inc.
               b. Shall be compatible with all materials that sealant will bond to
               c. Backer rod shall be of a closed cell type
    
     D. Performance Requirements:
         
          1. Negative Uniform Load Testing: Ultimate failure shall not occur under 59 psf
         
          2. Pull Out Capacity of Metal Insert: When loaded from a minimum of 12
              inches from any end shall ultimately fail at no less than 227 pounds, and no
              less than 88 pounds when loaded at 1-inch from the end.
         
          3. Vertical Load Testing: Ultimate failure shall not occur under 3200 lbs. at
              edges and 6330 lbs. at the interior location

1.06 SUBMITTALS
    
     A. Submit under provisions of Section 01300 Submittal Procedures.
    
     B. Shop Drawings: Submitted upon request.
    
     C. Reports and Certificates: Copies of third party independent laboratory’s test report verifying the
         performance of the STYRO-loc® System submitted upon request

1.07 QUALITY ASSURANCE

     A. Qualifications:
         
          1. System component materials shall be manufactured or approved by Foam
          Concepts, Inc. and shall be distributed by the same or its authorized dealers.
         
          2. Desired shapes shall bare STYRO-loc® name on ends ensuring that the metal
          insert slot has been inspected.
         
          3. Metal Cap shall be a minimum of 24 gauge galvanized sheet metal
         
          4. Metal Straps shall be a minimum of 16 gauge galvanized sheet metal
         
          5. Sheet Metal Contractor knowledgeable in the proper application of the metal cap and metal straps
         
          6. Base coat, adhesive, and non metallic reinforcing mesh shall be provided by
          Omega Products International, Inc. or equivalent manufacturer
         
          7. EIFS Contractor knowledge in the proper application procedures of Architectural EPS Shapes
         
          8. Sealant contractor experienced and competent in the installation of elastomeric construction sealant.

     B. Mock-Ups: Produced upon request.
         
          1. Prior to commencement of work, provide a mock-up for approval:
               a. Size suitable to represent the products to be installed and each
                   color and texture, constructed using the same tools and techniques
                   to be utilized on the project.
               b. Retain approved mock-up at job site throughout the application
                   process.

1.08 DELIVERY, STORAGE, AND HANDLING

     A. Deliver all materials to the construction site in their originally manufactured state

     B. Inspect the materials upon delivery to assure that specified products have been received.
         Report defects or discrepancies to the responsible party according to the contract agreement;
         do not use reported material for application.

     C. Store materials in a cool, dry place, protected from weather and other damage.
          Do not store materials in direct contact with the ground

1.09 PROJECT CONDITIONS

     A. Existing Conditions: Access to electrical outlets, clean, potable water, and suitable work area at the
         construction site throughout the application of the EIF System.

1.10 SEQUENCING AND SCHEDULING

     A. The installation of the STYRO-loc® System shall be coordinated with all other construction trades.



PART II PRODUCTS


2.01 MANUFACTURERS
    
     A. Acceptable Manufacturer: Foam Concepts, Inc.

2.02 COMPONENTS

     A. Architectural EPS Shapes: M.V. min 1lb. Density at parapet locations EPS foam must be listed
          and be manufactured under quality control program using a third party inspection agency

     B. STYRO-loc®: 24 gauge metal insert placed a minimum of 2.5 inches from end of Architectural EPS Shape

     C. Metal Cap: Minimum 24 gauge galvanized sheet metal

     D. Metal Straps: Minimum 2 inches x 16 gauge galvanized sheet metal placed a maximum of 24 inches on center

     E. Adhesives: Omega Drybond, Styro-Glue, Styro-Glue DM, Styro Bond, or equivalent.

     F. Base Coat: Omega Drybond, Styro-Glue, Stryo-Glue BG, Styro-Glue DM, Stryo-Glue TF, FoamTek, or equivalent.

     G. Sealant: Shall be installed in a timely manner



PART III EXECUTION


3.01 EXAMINATION
    
     A. Prior to installation of STYRO-loc® System the installer shall ensure that the substrate:
         
          1. Is of the same type as that listed in under Section 1.05 Design Requirements of this specification.
          2. Shall be true, flush, and free of any irregularities within _" in a 4’ radius.
          3. Shall be sound, dry, properly abutted, and have no surface voids, projections or other discrepancies that may interfere               with the application of the system.

     B. Ensured that all flashing or other waterproofing materials have been properly installed.

     C. The installer shall notify the owner and architect of any discrepancies found.

3.02 SURFACE PREPARATION

     A. Clean the substrate to which the System is to be applied, ensuring that there are no foreign
         materials present.
         
          1. Foreign materials include, but are not limited to, oil, dirt, dust, form release agents,
              efflorescence, paint, wax, water repellants, moisture, frost.

3.03 INSTALLATION

     A. Install the System in accordance to this specification

     B. Architectural EPS Shape Application:

          1. Wrap all areas with the appropriate nonmetallic reinforcing mesh
          2. Apply to the substrate tightly butting all joints
          3. Attach using an approved adhesive
          4. Ensure the Architectural EPS Shapes are true and aligned

     C. Metal inserts shall be inserted continuous in to desired Architectural EPS Shape
    
    
D. Adhesive: Applied according to adhesive manufacturer’s written specifications
    
     E. Base Coat: Applied according to the base coat manufacturer’s written specifications
    
     F. Metal Straps: Screw into STYRO-loc® Metal Insert and into parapet using a hex head self
         drilling screw (0.125 inch shank minimum)

     G. Metal Cap: Installed according to metal cap manufacturer’s written specifications

     H. Sealant: Applied according to sealant manufacturer’s written specifications

3.04 FIELD QUALITY CONTROL

     A. Assume responsibility for the proper application of the STYRO-loc® System;
         provide written certification of workmanship relative to the substrate, system materials,
         installation procedures, and details as requested.

     B. If requested provide written certification from the sealant installer that the sealant and
         backer rod and their applications are in accordance with that of the sealant manufacturer
         and Foam Concepts, Inc.

3.05 CLEANING

     A. Remove any and all materials used

     B. Clean all adjacent materials, surfaces and their work area of any excess materials
         produced as a result of their application.

3.06 PROTECTION


     A. Protect the STYRO-loc® System from weather and other damage until flashings,
        
sealants, etc. are installed.

     B. Protect all surrounding areas and surfaces during application of the System.